Operations

Task Dashboard

Every workstream. Every milestone. Live status across all three products, the factory, funding, and the website.

Total Tasks

82

Complete

21

In Progress

2

Pending

59

Overall Progress

26%

LEGAL & IP

3/9 complete

33%

Guardian Angel provisional patent

Filed March 2026

Complete

Rattle Cane provisional patent

Filed March 2026

Complete

Vantedge Home provisional patent

Filed March 2026

Complete

Guardian Angel non-provisional patent

Due within 12 months of provisional

Pending

Rattle Cane non-provisional patent

Due within 12 months of provisional

Pending

Vantedge Home non-provisional patent

Due within 12 months of provisional

Pending

Product liability legal review — Rattle Cane

Required before launch

Pending

NC foreign LLC Certificate of Authority

After angel round closes

Pending

Operating agreement update post-investment

Pending

FUNDING

2/10 complete

20%

Angel round structure finalized

$1M / 5 investors / 4% each

Complete

Investor dashboard live

everyday-steve.com/investors

Complete

Investor 1 committed

$200K / 4%

Pending

Investor 2 committed

$200K / 4%

Pending

Investor 3 committed

$200K / 4%

Pending

Investor 4 committed

$200K / 4%

Pending

Investor 5 committed

$200K / 4%

Pending

SBA 504 application

After factory is operational

Pending

NC JDIG grant application

New Hanover County incentive

Pending

One NC Fund application

Pending

FACTORY

1/11 complete

9%

City confirmed — Wilmington NC

New Hanover County

Complete

Site search initiated

8,000–12,000 sq ft industrial target

In Progress

Site selected

Pending

Lease signed

Pending

Build-out permits

ESD flooring, electrical, compressed air

Pending

Rattle Cane line tooling ordered

$5,450 total tooling

Pending

Rattle Cane line operational

Pending

Guardian Angel ESD workstations installed

6 stations required

Pending

Guardian Angel line operational

After FCC approval

Pending

NCMEP consulting engaged

NC manufacturing extension program

Pending

Cape Fear CC workforce pipeline initiated

Pending

RATTLE CANE

3/13 complete

23%

Prototype validated

Sound confirmed. Momentum transfer confirmed.

Complete

Hardware design document v1.0

Complete

Provisional patent filed

3 independent claims

Complete

Product liability legal review

Required before any marketing or sales

Pending

CNC plug supplier locked

6061 aluminum end plugs

Pending

Tungsten sinker supplier locked

95%W alloy fishing sinkers

Pending

Derby handle supplier locked

Zinc core / TPR overmold

Pending

Anodize vendor selected

Type II matte black

Pending

Tooling ordered

Pending

Pilot run — 50 units

First production batch

Pending

QC protocol validated

5-point rattle test

Pending

Website pre-order page live

Pending

Full production launch

Pending

GUARDIAN ANGEL

3/16 complete

19%

Hardware design document v1.0

Complete

Software design document v3.0

9-tab app architecture locked

Complete

Provisional patent filed

5 independent claims

Complete

PCB schematic — KiCad power tree

nRF52840 + nRF9161

In Progress

PCB layout complete

Pending

First prototype assembled

Pending

Wake word validated — "Vanessa"

TFLite Micro / Edge Impulse

Pending

LTE-M connection validated

Twilio Super SIM

Pending

Bone conduction audio validated

Pending

SOS triple-press validated

Pending

FCC pre-certification testing

Pending

FCC filing

Pending

FCC approval

Pending

Beta program — 10 units

Pending

App Store + Play Store submission

React Native Expo / EAS

Pending

Production launch

Pending

VANTEDGE HOME

2/12 complete

17%

Hardware design document v1.0

Complete

Provisional patent filed

5 independent claims

Complete

Dock Tablet reference design selected

10.1" IPS / ARM Cortex-A55

Pending

Voice Speaker enclosure design locked

Dayton Audio ND140-8 drivers

Pending

Pulse Watch PCB layout complete

nRF52840 / MAX30102 / MPU-6050

Pending

Vanessa cloud platform alpha

Supabase + Vercel + ElevenLabs

Pending

Family app alpha — iOS + Android

React Native Expo

Pending

Grandmas Postcard feature validated

Under 10 seconds end-to-end

Pending

Integrated prototype — all 3 devices

Pending

FCC certification — Dock + Voice Speaker

Pending

Closed beta — 10 homes

Pending

Public launch

Pending

WEBSITE

7/11 complete

64%

everyday-steve.com rewrite

Next.js 14 / Tailwind / Vercel

Complete

Homepage live

Complete

Products page live

All 3 products with galleries

Complete

Investors dashboard live

Complete

Factory page live

Complete

Tasks page live

Complete

Contact page live

Supabase form submissions

Complete

Admin panel — milestone updates

Update statuses without code

Pending

Investor login — gated documents

Pending

Stripe checkout — Guardian Angel

After FCC approval

Pending

Stripe checkout — Rattle Cane

After pilot run

Pending

Stay Updated

Watch this page.

This dashboard updates as milestones are reached. Investors see progress in real time. No emails required.